Tickenham Court
The Hall at Tickenham Court has been standing since around 1400, with a parlour and solar wing tacked on a century later. A leaky roof and some questionable past tinkering had left the old fabric in a sorry state, so Corbel rolled up its sleeves for some serious roofing, carpentry and masonry TLC.
Out came the modern ceiling and floor, unveiling the glorious medieval structures beneath. Under cover of scaffolding and a temporary roof, lost timbers were replaced and the whole structure quietly braced with three concealed steel trusses, doing their heavy lifting out of sight.
Windows were brought back to their historic best, stone hand-worked on site, and old cement swapped for lime putty. Five coats of limewash, a fabulous new timber Oriel window and ground concrete floor later, the old Court looks better than ever.

Built on history
The magnificent carpentry was designed in conjunction with architect George Tasker of Architecton. The project also included a bespoke new-build element: an oak, stone and lead oriel link building. Designed to step neatly into the footprint of its long-lost predecessor, it reuses the original footings that still form part of the building today.


Well earned
Bringing Tickenham Court back to its best meant respecting its history, while also getting it ready for whatever the next few hundred years might hold. That careful balancing act was recognised with the William Stansell Award and LABC’s Best Non-Residential Extension or Alteration, both in 2021.